A quote example, and how to compare two

A lower quote is not cheaper if it covers less work, and a higher one is not dearer if it includes the materials, removal and travel that the other charges separately.

6 min readUpdated 23/11/2026Mendkin

Quotes can be compared only when they cover the same scope. Put them side by side and ask of every item whether it is in the price: preparation, work, material, travel, removal, final cleaning and VAT. What one quote leaves out becomes a question, not an assumption. Then compare quantities and dates, because a different total often comes from a different quantity. A complete quote says who offers, what is done, how much of each thing, what is not included, the total, the start and the finish, and how long it stands. Work and material are better kept apart, so you see what changes when you buy the material yourself. If the amount is a range, ask what the lower and the upper end depend on. The lowest amount can simply mean less work. Decide once everybody has answered the same questions and the unclear items are settled in writing.

A quote template, item by item

Provider and client, place of work, date. The present state and what is done, in order. Labour: item, quantity, unit, price. Materials: name, quantity, who buys them, price. Travel and removal: included or separate. Not included: a list. Total, stating VAT. Start, finish and how long the quote stands.

What does a clearly written service look like?

The service sink unblocking published by Vodoinstalater Istra says what is included and, in a separate field, that materials, travel outside Pula and urgent call-outs are charged separately. That is something you can ask about and compare.

What should I ask before agreeing?

Who will come and who is responsible for the agreement? What could raise the amount? When will you tell me? What should I prepare? Ask for the answers in a message, so they stay written down.

What does the amount depend on?

It differs by service. Each is summarised on its price page, for example electrician, tiler and façade contractor; all are listed on prices by service.

What must a quote say to be comparable?

The scope, items with quantities and units, labour and materials apart, travel, the deadline and whether VAT is included. Without these, two quotes are not for the same job.

If an item is missing, ask before comparing totals. The free quote template has a field for each of these.

Item in a quoteWhy it matters
Scope: what is done and what is notwithout it nobody knows what the sum is for
Quantities with a unit (m², m, pieces, h)lets you compare per unit
Labour and materials apartshows who buys and at what price
Travel, removal, cleaningitems often added later
Time to finish and how long the quote standsshows when and until when
VAT: included or nota difference of a quarter of the sum

How do I compare quotes item by item?

Put them in two columns and pair the same items. Whatever is left without a pair is a difference in scope.

  1. Copy the items of both quotes side by side.

  2. Bring the sums to the same basis: with VAT or without.

  3. Pair the same items and compare the unit price.

  4. Mark the items only one quote has.

  5. Ask the other provider what a missing item would cost.

Why do quotes for the same job differ?

Because of scope, materials, access and how risk is judged. A provider who has seen the place usually also prices what only shows once work starts.

A large gap is not in itself a sign that someone is cheating. More often it means the two quotes are for two different jobs, which an item-by-item comparison shows quickly. Published prices by kind of job, with sources, are on prices.

What if one quote has no items?

Ask for a breakdown by item before deciding. A total without items cannot be compared, nor checked when the job changes.

If a provider will not break the quote down, that is information for your decision. For small jobs, such as replacing a tap, one item of labour and one of materials is enough.

If the scope changes during the work, agree the new item in writing, with its amount, before it is done.

What does an itemised quote look like?

Each item has a description, unit, quantity and unit price, followed by the sum, VAT and total. You can fill in and print such a quote with the quote template.

  1. Scope: "Retiling a 2 × 2.5 m bathroom, walls up to the ceiling".

  2. Removing old tiles: m², quantity, price per m².

  3. Waterproofing the floor and the shower area: m², quantity, price per m².

  4. Laying tiles: m², quantity, price per m².

  5. Removing rubble: flat rate.

  6. Sum, VAT and total; time to finish and how long the quote stands.

How do I ask for a quote to be completed?

Briefly and in writing: name the missing item and ask for its price. The addition then stays on record with the quote.

For example: "I do not see rubble removal or waterproofing in the quote; are they included? If not, what would they cost?" Ask the same question of every provider whose quote you compare, or the comparison is uneven again.

When to decide, and how to tell them?

When the quotes are comparable and you know which you would accept, tell everyone your decision. For those you did not choose, one sentence of thanks is enough.

Confirm the chosen quote in writing, with its number or date, and agree the start. If anything in the scope has changed since the quote was sent, now is the time to add it, before work begins.

A short "thank you, we chose another quote" saves providers time and leaves a good impression if you need them another time.

How do I compare quotes with different materials?

Ask both providers for the name and grade of the materials, then compare labour separately from materials. Labour is what differs from provider to provider.

With tiles, sanitaryware or paint, the difference in material prices can be larger than the difference in labour. If you buy the materials yourself, ask for labour-only quotes, but with the same scope and quantity, and settle who is responsible if materials arrive damaged or short.

Questions

Should I always take the lowest quote?

Only if it covers the same scope. Compare the items before the totals.

What if a quote does not say whether VAT is included?

Ask before comparing, because the difference is a quarter of the sum.

How do I compare an hourly quote with a fixed one?

Ask how many hours the hourly provider expects and what happens if it takes longer, then compare the expected totals.

Can a quote be a range instead of one sum?

Yes, if it says what decides the low and the high end. Without that you do not know what you are agreeing to.

How many quotes are enough?

As many as you can really compare. Two complete quotes say more than five incomplete ones.

Related

Need someone for this?

Describe the job. It goes only to providers who cover your place, at most as many as you choose.