House moving: prices in Croatia
Van and two workers, minimum two hours: €80.00 (per hour, source does not state VAT), as published by Selidbe Zagreb and read on 23/11/2026. All published prices found are below, 4 in total, each with its own source and basis.
Each price is the one published on the source's own page. None is an offer, and none is taken from offers on Mendkin.
Published prices
- Van and two workers, minimum two hours€80.00 per hour, source does not state VAT · Selidbe Zagreb
- Two workers and a van, first hour€45.00 – €60.00 per hour, source does not state VAT · kombiprijevoz.hr
- Two workers and a van, each further hour€35.00 – €45.00 per hour, source does not state VAT · kombiprijevoz.hr
- Two workers and a truck, first hour€55.00 – €70.00 per hour, source does not state VAT · kombiprijevoz.hr
Why do prices differ?
Moving is charged by the hour for the crew and vehicle, plus kilometres in both directions. Floors without a lift, carrying distance, dismantling furniture and a minimum of hours decide the total.
What should the request say?
Send both addresses with floors and lifts, a list or photos of the large items, whether furniture must be taken apart, and the date.
Sources
Prices were read on the source pages on 23/11/2026. A source may have changed since.
Prices by kind of job in Croatia
- Bathroom renovation
- Apartment renovation
- Thermal façade per m²
- Tiling per m²
- Air-conditioning service
- Air-conditioning installation
- Heat pump
- Metal roof per m²
- Electrician, urgent call-out and hour
- Wall painting and skimming per m²
- Plumber: hour, call-out and common jobs
- Prefabricated house per m²
- Chimney sweeping
- Gas boiler service
- Roller shutters
- Drywall per m²
- Home solar power plant
- Apartment cleaning
- Website design
- Plastering per m²
- Floor screed per m²
- Laminate fitting per m²
- Parquet sanding and varnishing per m²
- Septic tank emptying per m³
- Tiled roof per m²
- Terrace and flat roof waterproofing per m²
- Electrical wiring of a flat per m²
- Yard paving per m²
- Demolition and stripping per m²